A Manufacturing Facility
Problem: Costly case assembly.
Solution: Pre-assembled inserts with labels (packaging tie-in).
Result: $104,400 saved.
Problem: Costly case assembly.
Solution: Pre-assembled inserts with labels (packaging tie-in).
Result: $104,400 saved.